Dudley Park Aquatic Centre
This project, commissioned in March 2010 is a multi pool complex consisting of an indoor 25m Lap Pool,
Leisure Pool including lazy river, Spa Pool & Learners Pool.
The pool water services for this project included:
- Pumping and Sand Filtration for all systems
- Piping for all the above
- Ezetrol Chemical Control Systems using Sodium Hypo and C02
- Siemens UV
- Stainless Steel Water Features
The duration of pool water services was 12 Months (completed March 2010)