Dudley Park Aquatic Centre

This project, commissioned in March 2010 is a multi pool complex consisting of an indoor 25m Lap Pool,
Leisure Pool including lazy river, Spa Pool & Learners Pool.


The pool water services for this project included:

  • Pumping and Sand Filtration for all systems
  • Piping for all the above
  • Ezetrol Chemical Control Systems using Sodium Hypo and C02
  • Siemens UV
  • Stainless Steel Water Features

The duration of pool water services was 12 Months (completed March 2010)