Recent Filtration & Plant Equipment Jobs

Below is a list of some of our recent filttration and plant equpment jobs, these jobs range from small filtration installations to large multi pool aquatic facility installations.


Mt Manganui Hot Pools, Mt Manganui – New Zealand

This project comprised of the pool water services for a retrofit of the existing 25m lap pool, active pool, passive, toddlers and two spa pools which had been extensively refurbished. The plant consisted of Aquaboss Vacuum Media Filtration and circulating pumps for the above mentioned pools, Ezetrol Plus chemical control and associated Co2 & Sodium Hypochlorite dosing systems.

Tawa Primary School, Wellington – New Zealand

This project comprises the pool water services fit out of an indoor school pool. The pool is on Pressure Media Filters. The project also includes the provision of disinfection systems, heating, as well as associated electrical work etc.

Next Generation Club Auckland Tennis Centre – New Zealand

This contract comprised of the pool water services for indoor and outdoor 25m lap pools, plunge pools, spa pools and sauna & steam rooms. The plant consisted of Sand Filtration, Siemens UV, Ezetrol Plus chemical controllers, Co2 dosing system & a sodium hypochlorite dosing system. We also supplied lane ropes, stainless steel hand rails and ladders and automatic pool vacuum equipment for this facility.

Hanmer Springs Thermal Pools, Hanmer – New Zealand

This project comprised of the pool water services for a new outdoor heated 25m, three water sensations pools, a children’s Aqua-play area and a Super Bowl hydroslide. The plant consisted of Pressure Media filters and circulating pumps for the above mentioned pools, Heat Exchangers, Chemical Control and associated dosing systems for Co2 and Sodium Hypochlorite. We also supplied Thermal Pool blankets and reel systems along with automatic cleaning equipment.

ASB Aquatic Centre, Richmond – New Zealand

This contract comprised of the water services for the learn to swim pool at the ASB Aquatic Centre in Richmond. The job involved the supply and installation of three Sand Filters & circulating pump, Heat Exchanger, an Ezetrol Chemical Controller, Co2 dosing system and Sodium Hypochlorite dosing system.

Dudley Park Aquatic Centre, Rangiora – New Zealand

This project comprised of the pool water services for a new indoor aquatic facility in North Canterbury. The job involved the supply and installation of Sand Filtration and circulating pumps for the above mentioned pools, UV disinfection, Ezetrol Chemical Controllers and associated dosing systems for Co2 and Sodium Hypochlorite. We also installed stainless steel water features for this job.

Solid Energy Centre, Westport – New Zealand

This project comprised of the pool water services for a new aquatic facility consisting of an indoor 25m lap pool, Lean to Swim Pool and leisure/toddlers pool. The plant consisted of Sand Filtration for the above mentioned pools, UV Disinfection, Chemical Control and dosing systems for Co2 and Sodium Hypochlorite. We also supplied overflow channel grating and Thermal Pool Blankets for this job.

Norman Kirk, Auckland – New Zealand

This project comprised of the pool water services for a new aquatic facility build consisting of indoor and outdoor 25m pools, Spa Pool, Leisure Pool and Toddlers Pool. This pool involved the installation of Pressure Media filters for the above mentioned pools and circulating pumps. We also installed a chemical control system and associated Co2 and Sodium Hypochlorite dosing systems. For this job we also supplied the overflow channel grating.

Bob Owens Retirement Village, Tauranga – New Zealand

This contract comprised of the pool water services for the hydrotherapy pool in a new retirement village constructed in Tauranga. The plant consisted of two Waterco S900 Sand Filters, a Zodiac TriMid salt chlorinator controlled by a D10 Chemigem ORP chemical controller. This contract also included the supply and install of a 17kw heat pump.

Kirwee Model School, Canterbury – New Zealand

This job involved the supply and installation of new stainless steel hand rails and ladder to an existing in ground 22m school pool. We also supplied and installed an automatic chemical control system and dosing equipment for pH control and Sodium Hypochlorite.

Central Otago District Council – New Zealand

This project involved the installation of four Ezetrol Plus FAC chemical controllers and Co2 dosing systems into an existing plant room at the Molyneux Aquatic Centre in Alexandra and the installation of a Co2 dosing system to service the three pools at the Cromwell Aquatic Centre.

Kiri Te Kanawa Retirement Village, Gisborne – New Zealand

This contract comprised of the pool water services for the hydrotherapy pool in a new retirement village constructed in Gisbourne. The plant consisted of two Waterco S800 Sand Filters, a Hurlcon VX7 salt chlorinator controlled by a Chemigem ORP chemical controller. This contract also included the supply and install of a 17kw heat pump.

Metlife Care Takapuna, Auckland – New Zealand

This project comprised of the pool water services for a Therapeutic Pool and Spa Pool for an aged care facility in Auckland. The contract consisted of the supply and installation of Sand Filtration and circulating pumps for the above mentioned pools, Ozone disinfection & Heat Exchangers, Chemical Control and associated Co2 & Sodium Hypochlorite dosing systems.

Soho Apartment, Wellington Central – New Zealand

This project comprises the pool water services fitout of an apartment pool and Sauna. The pool is on Sand filtration. The project also includes disinfection systems via Siemens NX controller, heating as well as associated swimming pool equipments etc.

Century City Glass Pool, Wellington Central – New Zealand

This project comprises the pool water services fitout of an indoor apartment pool. The project also includes the provision of disinfection systems, heating, as well as associated electrical work etc.

Berhampore School, Wellington – New Zealand

This project comprises the pool water services fit out of an outdoor school pool. The pool is on Pressure Media Filters. The project also comprises a heating system comprising a MX 400 Hurlcon gas heater. The project also includes the provision of disinfection systems, heating, as well as associated electrical work etc.

Quality Hotel, Wellington – New Zealand

This project comprises the pool water services fitout of an apartment pool and separate spa pool. The project also includes the provision of disinfection systems as well as associated electrical work etc.

Wellington Construction Tory Street Apartment, Wellington – New Zealand

This project comprises the pool water services fitout of an indoor apartment pool. The project also includes the provision of disinfection systems, heating, as well as associated electrical work etc.

Oxford Crescent School, Lower Hutt – New Zealand

This project comprises the pool water services fit out of an outdoor school pool. The pool is on Pressure Media Filter. The project also comprises a heating system comprising a MX 400 Hurlcon gas heater. Also included is a bulk 13.5% sodium hypochlorite storage system with dosing of this as well as CO2 controlled via a Siemens Setpoint NX controller, as well as associated electrical work etc.

Rauhine School, Dannevirke – New Zealand

This project comprises the pool water services fit out of an outdoor school pool. The pool is on Pressure Media Filters. The project also comprises a heating system comprising a MX400 Hurlcon gas heater. The project also includes the provision of disinfection systems, heating, as well as associated electrical work etc.

Government house Reflective Pool, Wellington, New Zealand

This project comprises the pool water services fit out of an outdoor school pool. The pool is on Pressure Media Filters. The project also includes the provision of ionising disinfection system.

Putaruru Outdoor pool, Tokorua

Vacuum DE filteration System.

Pagoda Reflection Pool – New Zealand

This project comprised of the pool water services

Pleasant Point, Timaru – New Zealand

This project comprised of the retrofit of a new filtration and circulating system to an existing toddlers pool which had been refurbished. The job involved the installation of a 12 element Vacuum Media Filter & circulating pump

Trent Bray Swim School, Auckland – New Zealand

This project comprised of the pool water services for a new 25m lap pool and 13m lean to swim pool by Myrtha pools. The filtration for these pools used Aquaboss Vacuum Media Filters. This job also comprised the supply and installation of MacBall thermal pool blankets and an underbench reel system.

Cromwell Aquatic Centre, Central Otago – New Zealand

This contract comprised of the pool water services for a new Myrtha Lean to Swim Pool, Spa Pool & Toddlers Pool. This project utilised an Atlas Pressure Media filter and also included the provision for Strantrol System 3i chemical controllers.

Kingston Waves, Melbourne – Victoria

This project comprises the removal of three 2,250mm diameter sand filters to be upgraded with a twin tank 108 element ICL Vacuum Media Filtration system including VSD controlled pumps and our patented Dry Hopper Technology for body feeding.

Mildura Waves, Mildura – Victoria

This project comprises the installation of three Wallace and Tiernan Astron medium pressure UV systems with automatic disinfection control on the 25m lap pool, wave pool and spa pool.

Kaiapoi Aquatic Centre, Canterbury – New Zealand

This project comprises the installation of two separate Wallace and Tiernan Astron medium pressure UV systems, one each to the existing main and learner’s pools (respective flow rates 140m/hour and 60m/hour).

Whangarei Aquatic Centre, Northland – New Zealand

This project comprises the pool water services fitout of an extension to the existing Whangarei Aquatic Centre. This new indoor development comprises a Lap/Wave Pool, Hydrotherapy Pool, Spa Pool and Tot’s Pool. All pools use Waterco SMDD high rate multi media sand filters with disinfection via gas chlorination, controlled via automatic pool water chemistry controllers. The hydrotherapy pool is fitted with a Wallace and Tiernan Astron medium pressure UV system.

The Pier Apartments, Kapati Coast – New Zealand

This project comprises the pool water services fitout of an outdoor apartment pool. The project also includes the provision of disinfection systems, heating, as well as associated electrical work etc. The provision of two water feature systems was also included in the project.

Museum Apartments, Wellington – New Zealand

This project comprises the pool water services fitout of an apartment pool, separate spa pool and sauna. The project also includes the provision of disinfection systems as well as associated electrical work etc.

Oxford Community Pool, Oxford – New Zealand

This project comprises the pool water services fitout of an outdoor 25 metre lap pool as well as a 9 metre by 6 metre learner’s pool. These two pools are of Myrtha Pool construction and utilise pressure media filtration. The project also comprises of disinfection and electrical fitout etc.

Rangi Ruru Girls School, Christchurch – New Zealand

This project comprises the pool water services fitout of a 25 metre lap pool. This was a design build project incorporating a 40 element vacuum media filtration system with VSD driven pump. The project also included a heating system comprising a “strip type” solar system and supplementary Hurlcon gas heater with a 105kW output. Also included was a bulk 13.5% sodium hypochlorite storage/dosing system as well as CO2 controlled via a Strantrol Setpoint controller, as well as associated electrical work etc.

Onehunga War Memorial Pool, Auckland – New Zealand

Project comprised of the pool water services fitout of the Jellicoe Spa Pool, which is a 14m commercial spa pool development at the above Auckland City Council facility. The filtration system comprises two Waterco SM1400 sand filters with VSD driven pumps. Disinfection is via 13.5% sodium hypochlorite and CO2 gas, controlled by a Strantrol Setpoint automatic chemistry controller. The project also comprises a new heating system including a new plate heat exchanger and digital temperature controller, as well as associated electrical work etc.

Mount Eden Swimming Pool, Auckland – New Zealand

Project comprises the installation of a Heliocol solar pool water heating system, as well as two 35m timber tanks for rainwater retention which is to be used as make up water.

Waihi College – New Zealand

Project comprised the removal of an old sand filtration system and associated equipment. A new 40 element vacuum media filtration system was put in its place. The project also includes the installation of an automatic water chemistry controller as well as an upgrade of all valves etc within the balance tank.

Splash Palace, Invercargill – New Zealand

Project comprised the pool water services fitout of a new 120m indoor learners’ pool. The scope includes the installation of three 1600mm diameter high rate multimedia sand filters (Waterco SMD1600’s), associated pumps (including VSD drives) and pipework, as well as chlorine gas dosing equipment controlled by an automatic chemistry controller, ozone dosing equipment and automatic turbidity monitoring etc.

Bolton Street Apartments, Wellington – New Zealand

Project comprised the pool water services fitout of an apartment pool, separate spa pool and sauna. The project included the provision of automatic chemistry control as well as heating via an electric heat pump.

Hokitika Swimming Pool – New Zealand

Project comprised the removal of an old 2000mm diameter sand filter through the plantroom roof. A new Waterco 2000mm diameter sand filter was installed in its place.

Southland Hospital, Invercargil – New Zealand

Project comprised the pool water services fitout of a new hydrotherapy pool. The system comprised a sand filtration system, chemical dosing along with Ozone, as well as heating via a heat exchanger run off the hospitals existing boiler.

Sanctum Apartments, Wellington – New Zealand

Project comprised the pool water services fitout for an apartment swimming pool, separate spa pool and sauna. The project included the provision of automatic chemistry control as well as heating via a gas heater.

Wellington Rugby Union (Hurricanes/Lions Training Facility), New Zealand

Project comprised the pool water services installation for two plunge pools. One was a hot pool that utilised a pressure media sand filtration system as well as a heat pump to maintain the pool at 35 to 38c. This pool incorporates a series of massaging water jets operated by a separate pumping system to the filtration system. The other was a cold plunge pool which also uses a pressure media filtration system as well as a chiller unit to maintain the pool at 10c.

Trinity College, Perth - Western Australia

Supply and oversee the installation of a twin tank, 132 element vacuum media filtration system for a 1950 m college pool.

Geraldine Community Swimming Pool – New Zealand

Supply and installation of a new vacuum media filtration system for the new learner’s pool including all pipework and balance tank valves etc. Supply and install new reticulation pipework for main pool, including new balance tank valves and relocate the existing filters.

Napier Salt Water Baths – New Zealand

Comprises a new Outdoor Swimming Pool Complex in Napier. Supply and installation of 4 new Vacuum Media Filtration systems to service various pools. Supply and installation of a 3 Pressure Media Filtration systems to service new spa pools. Supply and installation of a dual filter sand filtration system to service a stream pool.

TSB Pool, Stratford – New Zealand

Remove an existing horizontal Sand Filter and pipework. Install a new 60-element Vacuum Media Filtration system in its place.

Lichfield Towers – Auckland, New Zealand

Comprises a new Indoor Swimming Pool Apartment Complex in Auckland. Supply and installation of new Pressure Media Filtration system and disinfection systems. Supply and installation of Spa-pool and other proprietary pool equipment. Supply and installation of a heat pump “run around” heat recovery system for enclosure ventilation.

Epsom Girls Grammar School – Auckland, New Zealand

Comprises a new 25 metre Indoor Swimming Pool Complex in Auckland Supply and installation of a new 50 element Vacuum Media Filtration plant. Supply of other proprietary pool equipment.

Nelson Hospital – New Zealand

Comprises a new Indoor Hydrotherapy Swimming Pool at Nelson Hospital. Design and supply and of new Pressure Media Filtration system and associated disinfection systems etc.

Thorndon Public Pool – Wellington, New Zealand

Comprises an existing Outdoor Swimming Pool in Wellington. Remove an existing Sand Filter and associated pipework. Supply and installation of a new 40-element Vacuum Media Filtration system.

Greerton Public Pool - New Zealand

Comprises an existing Outdoor Swimming Pool in Tauranga. Remove an existing Sand Filter and associated pipework. Supply and installation of a new 18-element Vacuum Media Filtration system.

Upper Hutt Aquatic Centre – Wellington

Comprises a new Outdoor Swimming Pool in Wellington. Supply and installation of a new 70-element Vacuum Media Filtration system. Supply of other proprietary pool equipment.

Century Public Pool – Timaru, New Zealand

Comprises an existing Indoor Swimming Pool in Timaru. Supply and installation of a new 48 element Vacuum Media Filtration system.