Latest News

 

New ARC 3 Tier Multi-Level Climb N Slide structure for Parnell Baths

To celebrate the Centenary of the Parnell Baths the Auckland City Council has contracted Ian Coombes Ltd to install a new 3 Tier Multi-Level Climb N Slide play structure.  The new 3 Tier Multi-Level Climb N Slide system which is currently under construction is a structure that combines many water play elements into a multi-level structure with slides. The water activities are the Water Funnel, Tube Slide, Water Bucket, Water Sprayer, Water Wheel, Water Pipe and Canopy.  This project is scheduled for completion in November 2014.

Parnell Baths Climb n Slide 

Ian Coombes Ltd Awarded MOE Contract

In June Ian Coombes Ltd was awarded the contract to repair and upgrade another 15 school pools in Canterbury as a part of the Ministry of Educations earthquake repair programme.  This brings the total number of school pools repaired and upgraded by Ian Coombes Ltd in Canterbury to 34. This contract is due for completion in November 2014 in time for schools to be able to use their pools again this summer.

 Lincoln High School Swimming Pool Concrete Pour

MacKenzie Pool - Hutt City

Recently awarded the redevelopment of the MacKenzie pool site includes a new 25m and LTS pool with an ARC splashpad. These toys come from their signature range and include item such as, Water logs, Rotating Spray Display and Water Booster. Completion is due in September 2013.

 

MacKenzie Pool