Mt Manganui Hot Pools
This project, commissioned in September 2011 is an outdoor community pool complex consisting of a
25m Active Pool, Passive. Toddlers and 2 outdoor spas.
The pool water services for this project included:
- Pumping & Vacuum Media Filtration for all systems
- Piping for all the above (PE, CPVC, PVC)
- Chemical Control Systems using Sodium Hypo and C02
- Pumps, piping, valves etc for water features
Duration of Pool water services was 12 weeks (completed September 2011)