Mt Manganui Hot Pools

This project, commissioned in September 2011 is an outdoor community pool complex consisting of a
25m Active Pool, Passive. Toddlers and 2 outdoor spas.


The pool water services for this project included:

  • Pumping & Vacuum Media Filtration for all systems
  • Piping for all the above (PE, CPVC, PVC)
  • Chemical Control Systems using Sodium Hypo and C02
  • Pumps, piping, valves etc for water features

Duration of Pool water services was 12 weeks (completed September 2011)

 