This project, commissioned December 2010 is a Community Pool complex consisting of an outdoor 25
metre pool, a 25 metre indoor heated pool, spa pool, leisure pool and toddlers pool.
The pool water services for this project included:
- Pumping and pressure media filtration for all above systems
- Piping for all of the above (PVC and ABS)
- Chemical control systems using Sodium Hypochlorite and CO²
- Heat exchangers
- Overflow channel grating.
- Pumps, piping, valves etc. for water features
Duration of pool water services was 18 months (completed December 2010).