Solid Energy Centre Westport

This project is a new swimming pool complex commissioned in April 2009. It included a new 25m Pool,
learn to swim pool and Leisure/Toddlers Pool.


The pool water services for this project include:

  • Pumping and sand filtration for all above systems
  • UV disinfection for all pools
  • Piping for all of the above (PVC)
  • Chemical control systems unsing sodium hypochlorite and Co2
  • Overflow channel grating
  • Pool thermal blankets

 


Duration of pool water services was 10 months (Completed April 2009).

 