Solid Energy Centre Westport
This project is a new swimming pool complex commissioned in April 2009. It included a new 25m Pool,
learn to swim pool and Leisure/Toddlers Pool.
The pool water services for this project include:
- Pumping and sand filtration for all above systems
- UV disinfection for all pools
- Piping for all of the above (PVC)
- Chemical control systems unsing sodium hypochlorite and Co2
- Overflow channel grating
- Pool thermal blankets
Duration of pool water services was 10 months (Completed April 2009).